f6a25d811f
Drafts Patch A (decrypt-storm fast-recover, Trigger B) at txrx.c:1696 with sliding-window threshold + ieee80211_connection_loss reassoc. Patch B (beacon-loss / Trigger A) parked behind one more diagnostic rep with 10s snap-loop cadence on the beacon-loss counter. Folds reviewer feedback from PR #3 + the new Trigger-A finding (post-resume P1 = api_connection_loss-driven, two reps captured today at 17:23 and 18:03) into a revised Phase 1 metric counting three event classes. Pending Phase 5 second-model review of the plan before Phase 6 implementation. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>