Commit Graph

15 Commits

Author SHA1 Message Date
claude-noether 6bae531917 notes: Bug #5 RX-degradation campaign — Phase 0 plan + research question
After Patch C v3 closed (PR #5 merged, Phase 7 N=3 verified at +73%
throughput vs Patch B baseline), the post-13-min RX-degradation
pattern remains.  Reproduces on Patch B, F, and v3 alike — independent
of the relay/race issues v3 addressed.  Side-effect that was masked
by the throughput floor while v2's race was the dominant variable.

Research question (locked):

  Why does the bes2600 RX path collapse from ~2 MB/s sustained @
  fresh-chip uptime to ~180 B/s @ ~28-min uptime, with periodic
  wsm_generic_confirm failed for request 0x0007 + ieee80211 phy0:
  [SCAN] Scan failed (-22) every 300 s in the intervening window?

Phase 0 protocol:

  - long-capture rig armed on ohm at uptime 0 (fresh boot 23:13 CEST)
  - ftrace events: workqueue, mac80211, cfg80211, mmc, sdhci, power
  - iw event (cfg80211 reason codes), dmesg follow, per-30s netdev
    counter snap, 5 stress probes at T+5/10/15/20/25 min

Phase 0 will:

  - re-anchor the predecessor data via the long capture (in-session
    N=1; re-run if anomalous)
  - characterize state transitions (first scan-fail, first throughput
    drop) via cfg80211/mac80211 ftrace + iw event correlation
  - feed Phase 1 metric formulation

Mechanism candidates (Phase 4 will discriminate):

  1. Firmware-side resource exhaustion (per-scan accumulator)
  2. NetworkManager scan-fail recovery loop competing with data
  3. AP-side rate limiting / fairness probation
  4. PSM state machine deadlock (c7 latch stale)
  5. SDIO bus retune interaction
  6. Power-management busy-event accumulator leak

Out of scope: Patch C2/D/E, higher-rate ramp, reproducing on different
APs.  Independent campaign from Patch C closure.
2026-05-07 23:23:31 +02:00
claude-noether d01400140b notes: Patch C v3 Phase 4 plan — drop sdio_rx_work, match cw1200
Supersedes v2 (PR #10).  cw1200 mining (~/src/linux-rockchip, 228
cw1200 commits) confirmed: upstream cw1200 has no sdio_rx_work
workqueue at all.  IRQ handler bumps bh_rx + wakes bh_wq; bh thread
does the SDIO read inline via cw1200_bh_rx_helper.  Single thread =
single writer for hw_bufs_used = no race by construction.  Same int
hw_bufs_used as bes2600, never atomic_t'd in 16 years upstream.

v3 brings bes2600 into that shape:

  - delete sdio_rx_work, self->rx_work, self->rx_queue,
    self->rx_queue_lock, bes2600_sdio_pipe_read
  - GPIO IRQ handler calls self->irq_handler directly (matches
    cw1200_sdio_irq_handler shape)
  - bes2600_bh_rx_helper's BES_SDIO_RX_MULTIPLE_ENABLE branch
    replaced with inline SDIO read + extract_packets + per-skb
    delivery via new bes2600_bh_handle_rx_skb()
  - GPIO wake-flag bracketing moves into bh thread

§5 shared-state delta table (the v2 lesson, applied):  zero fields
require new locking.  hw_bufs_used / hw_bufs_used_vif / wsm_tx_pending
all stay single-writer-from-bh.  v2's atomic_t prep is mooted.

§6 risk #6 is the open question for reviewer:  bes2600's
__bes2600_irq_enable(1) call is commented out in the BH-loop done:
label with an asm volatile("nop") in its place.  Either SDIO IRQ
is auto-managed (so commenting out is fine) or the current code
relies on sdio_rx_work being queued regardless of driver-side IRQ
flag.  Block Phase 6 on this audit.

Patch F (PR #4 merged) is the new baseline.  v3 will branch off
F-merged cleanups.  Phase 7 N=3 stress ramp uses wired enu1 path
(192.168.88.80) for wedge-resilient telemetry collection.
2026-05-07 21:36:15 +02:00
claude-noether 0b63ca3c24 notes: Patch C v2 Phase 4 plan — atomic_t prep + direct-deliver
Phase 7 of Patch C (PR #9 → bes2600-dkms PR #3 → boot -1 of ohm
20:18:10) failed with a thread-safety race: wsm_release_tx_buffer's
unlocked R-M-W on hw_bufs_used races against wsm_alloc_tx_buffer in
the bh thread when Patch C moved the RX-confirm decrement into
sdio_rx_work.  WARN storm at +13s under stress, chip wedges, host
off-network.

Phase 6 contract analysis cited wsm_handle_rx's sleepability and
held-lock invariants but stopped at the function signature.  Did not
enumerate hw_bufs_used as shared state mutated by the callee.  Lesson
saved as feedback_phase6_contract_threadsafety memory.

Phase 4 v2 designs around that gap.  Two-step:

1. Patch C-prep: NFC refactor — convert hw_bufs_used,
   hw_bufs_used_vif[], wsm_tx_pending[] from int / int[] to atomic_t /
   atomic_t[].  Use atomic_fetch_sub_release in wsm_release_tx_buffer
   (returns prior value for the >= numInpChBufs - 1 predicate).
   Mechanical atomic_read swap at ~58 read sites.  Lands first;
   Phase 7 should show zero delta from baseline.

2. Patch C v2: re-apply the sdio_rx_work direct-deliver on top of
   C-prep.  Identical structural change to the closed PR #3, but now
   the racing counter is safe.  Contract block in
   bes2600_bh_handle_rx_skb expanded to include the shared-state
   delta table.

Plan §2 is the shared-state delta table — every field
bes2600_bh_handle_rx_skb mutates directly or transitively, with
current protection and required action.  3 fields need atomic_t,
the rest are already concurrency-safe or stay single-writer.

Plan §6 lists 6 risks including memory-ordering choices, the
inc/dec_pending_count timer-decision race, and the new wired-rig
fallback (enu1 192.168.88.80) that survives bes2600 wedges so Phase 7
can capture dmesg / ftrace from a wedged ohm without reboot.

PR superseded #3 closed with full verdict comment.  Phase B rolled
back on ohm at /lib/modules/.../extra/bes2600.ko.  Markus's reboot
button to land Patch B again before C-prep work begins.
2026-05-07 20:50:39 +02:00
claude-noether f232476240 notes: Patch C Phase 4 plan — collapse sdio_rx_work into BH (item 1 only)
Per merged PR #8 inline review: items 1 and 2 split, sequential. Patch C
is item-1-only (collapse the sdio_rx_work → rx_queue → bh_work
indirection). Patch C2 (ieee80211_rx_list batch delivery) is split out
and gated on Task #19 kerneldoc contract verification.

Approach choice: Option A (sdio_rx_work delivers directly into
wsm_handle_rx, removing rx_queue and its two synchronization points per
frame) over Option B (subsume into bh thread). Option A has a smaller
diff and clearer bisection story; the residual per-IRQ workqueue
dispatch is preserved as a measurable Phase 7 data point that motivates
or doesn't motivate a follow-on Option-B patch.

Predicted delta in Phase 3 units, with confidence levels stated
explicitly. §4.6 lists 6 risks, of which 2 require Phase 6 contract
citations (wsm_handle_rx callability from sdio_wq context;
wsm_release_tx_buffer's bh-wake invariant). §4.8 mandates a stress
ramp in Phase 7, not a steady cap, per feedback_phase7_stress_ramp.

Symptom-shaped findings (asm nop, commented-out IRQ re-enable, BUG_ON
in hot path) explicitly deferred to Task #24 per
feedback_dont_patch_downstream_artifacts.

Awaiting Phase 5 second-model review on DokuWiki.
2026-05-07 19:04:53 +02:00
claude-noether 809e3cce84 notes: opus second-opinion BES2600 WiFi structural critique
Independent code-review writeup (Opus 4.7) against Sonnet's review of the
same tree. Concurs with Sonnet on items 1+2 (RX relay, batch delivery)
and items 4+5 (ba_lock atomics, ps_state_lock skip-when-pm_unsupported);
pushes back on the "9 workqueue events per frame" quantification and
records BES_SDIO_OPTIMIZED_LEN as hard-baked rather than togglable.

New findings: cw12xx-not-bes2600 genealogy still active in source, ~700
lines of #if 0 fossil in bh.c, Allwinner-specific sw_mci_check_r1_ready
in the SDIO bus path, asm volatile("nop") placeholder where IRQ re-enable
used to live, BUG_ON in steady-state hot path, vendor-SDK Makefile shape
that pollutes every diff, 8 EXPORT_SYMBOLs from a nominally-single-binary
module.

Recommends ordering: Patch C (1+2 wrapped) high-risk-first, Patches D+E
as small individually-verifiable cleanups, explicit don't-touch list.
Notes ieee80211_rx_list contract verification (task #19) blocks Patch C.
2026-05-07 18:12:54 +02:00
claude-noether 679083d1aa notes: Sonnet architect review for Bug #5 — ranked restructuring map
Sonnet (general-purpose subagent, model=sonnet) reviewed
~/src/besser/bes2600-dkms-mobian/bes2600/ given the Phase 0 measurement
context. Output: 8-item ranked restructuring map, file:line cited.

Headline:
- Item 1: collapse sdio_rx_work relay into BH loop (~5x workqueue
  dispatch reduction, medium effort)
- Item 2: batch deliver via ieee80211_rx_list (small effort, removes
  per-frame softirq)
- Items 1 + 2 together collapse "9 workqueue events per delivered
  frame" to ~1.

Items 3-5 clean up next-layer overhead (TX-side queue_work,
per-frame ba_lock, ps_state_lock under known-dead PSM). Items 6-8
are follow-ons to be re-measured after 1-3 land.

Phase 4 plan locking the lead candidate(s) follows in a separate PR.
2026-05-07 17:38:16 +02:00
claude-noether 594f73c6b4 notes: Bug #5 root cause refined — workqueue-per-SDIO-transaction is the floor
Follow-up ftrace measurement (post-reboot, 3-min 4MB/s capture):
- workqueue_execute_start: 5,643/sec  ← dominates
- wsm_cmd_send: only 13/sec (host-to-chip command path NOT the hotspot)
- lock contention: 50/sec (modest)

The throughput floor is set by per-SDIO-transaction workqueue dispatch
overhead. Surgical patches B5-1/B5-2/B5-3 from the prior Phase 4 plan
all targeted the wrong layer; deferring those until an architectural
restructuring map is produced.

Promoting the Sonnet architect review from "backlog" to
"blocking on Bug #5" — the next step is a restructuring assessment,
not another patch.
2026-05-07 17:31:31 +02:00
claude-noether 928268f477 notes: backlog Sonnet architect review of bes2600 driver
Per PR #6 review feedback. Independent track from Bug #5; scheduled
once the Bug #5 measurement pass finishes.
2026-05-07 16:38:58 +02:00
claude-noether 1830c17891 notes: Bug #5 Phase 1 metric + Phase 0 anchor receipts
Phase 0 anchored at N=3 reps (10min @ 4MB/s pv-cap on 2.4GHz):
- rep1+2: ~700 KB/s sustained (10% of link capacity)
- rep3: link death at ~9 min in (passive mode, beacon-loss cascade)

Hot symbol identified: _raw_spin_unlock_irqrestore at ~20% CPU in both
healthy and failed reps, callstack process_one_work → wsm_configuration
→ wsm_cmd_send → bes2600_bh.isra.0 → spin-unlock.

Phase 1 metric locked: ≥2 MB/s sustained throughput, <10% CPU in lock-
cycling, no link death under 30 min continuous load.

Three Phase 4 candidates drafted (B5-1: shrink wsm_cmd_send lock scope;
B5-2: coalesce vif_list_lock in BH dispatcher; B5-3: SPSC ringbuffer for
WSM commands). Locking pending review.
2026-05-07 16:32:45 +02:00
claude-noether 69a1d0f8b1 notes: phase 7 verdict — Patch A confirmed, Patch B dormant
Phase 7 verification of cleanups + Patch A + Patch B (srcversion
1B3B3ED0) on ohm 2026-05-07 12:48 → 15:13 CEST under netcat load
ramped 1 MB/s → 4 MB/s on 2.4GHz newton.

Patch A: predicted delta CONFIRMED at N=2 reproductions.
  - 13:47:56 storm → 1 s reassoc, no AP-deauth-6 escalation
  - 13:49:26 storm → 1 s reassoc, no AP-deauth-6 escalation

Patch B: installed, untriggered. 2 api_connection_loss events spaced
91 s apart, never tripping the 3-in-60s threshold. No false positives,
no spurious bus_resets. Recovery delta unobserved (no harm done).

Trigger C: 17-frame AP-deauth-6 cluster at 12:53 with no patch hooks
firing — bes2600 TX-side glitch suspect. Recovery via mac80211 reauth
in ~4 s. New backlog item.

Bug #5 documented separately (RX path degrades under throughput
pressure; possible root of the original Phase-0 YouTube frame drops).
2026-05-07 15:18:36 +02:00
claude-noether 458ad36f8b notes: backlog Bug #5 — RX path degrades under throughput pressure
Observed 2026-05-07: bumping the netcat sender from 1 MB/s to 4 MB/s
DECREASED ohm's observed RX rate (1015 KB/s → 563 KB/s) and degraded
the link (signal -57 → -67 dBm, MCS 4 → 3). Chip can't sustain near-
link-rate RX even though theoretical capacity is ~8 MB/s.

Hypothesis: driver/firmware lock contention or busy-wait on the RX
SDIO path. Plausibly explains the original Phase-0 observation that
YouTube DASH chunks drop ~10 frames per chunk fetch — chunk fetch is
a brief near-line-rate burst that this bug would be triggered by.
2026-05-07 13:56:36 +02:00
claude-noether e53aad5013 notes: phase 4 plan for Patch B (Trigger A / api_connection_loss)
Drafted after Phase 7 verification of Patch A (PR #1, srcversion
21BD07B3). 10h30m sustained load on 2.4GHz produced:
- 0 DecryptStormRecoveries (Patch A dormant; no decrypt-storm fired)
- 9 mac80211 api_connection_loss events
- 1 catastrophic blackhole at 02:42 (reason 4 inactivity → reauth
  with assoc-comeback timeouts → AP unprotected-deauth-6 cluster)

Phase 4 pivots to Trigger A (Patch B). Candidate B-1 lock proposal:
extend c5.2 bus_reset infrastructure to fire on N consecutive
api_connection_loss events; reuses existing recovery path.

Pending Phase 5 review before Phase 6 implementation.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-07 10:22:34 +02:00
test0r f6a25d811f notes: phase 4 plan artifact for BES2600 wifi-stability campaign
Drafts Patch A (decrypt-storm fast-recover, Trigger B) at txrx.c:1696
with sliding-window threshold + ieee80211_connection_loss reassoc.
Patch B (beacon-loss / Trigger A) parked behind one more diagnostic
rep with 10s snap-loop cadence on the beacon-loss counter.

Folds reviewer feedback from PR #3 + the new Trigger-A finding
(post-resume P1 = api_connection_loss-driven, two reps captured today
at 17:23 and 18:03) into a revised Phase 1 metric counting three
event classes.

Pending Phase 5 second-model review of the plan before Phase 6
implementation.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-06 19:10:12 +02:00
test0r 1a21212744 notes: phase 5 review artifact for BES2600 wifi-stability campaign
Captures Phase 0-3 receipts as of 2026-05-06: three Pattern-P1 events
reproduced (07:13, 11:03, yesterday 22:33), decrypt-failure metric locked
as Phase 1 with source pins (txrx.c:1696, wsm.h:620, wsm.c:1484), rig built
(snap loop + tcpdump filtered ring + iw event + dynamic_debug + netcat 1MB/s),
idle-vs-load comparison shows 35x burst-rate elevation under load with
conditional-escalation flip (100% idle / 0% load).

Pending Phase 5 second-model review before Phase 4 plan.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-06 15:23:24 +02:00
test0r e580126d84 Initial: BESser umbrella for BES2600 driver mainlining
Sets up the BES2600 mainlining work tree with:

- README: project overview, hardware target, driver lineage
  (CW1200 -> Bestechnic -> arjan-vlek -> Mobian/danctnix), patch series
  status, repo map, build/deploy workflow.

- patches/: c1 patch generated by git format-patch from
  marfrit/bes2600-dkms branch bes2600/factory-request-firmware
  (checkpatch.pl --no-tree --strict: 0 errors / 0 warnings / 0 checks).

- scripts/: build-bes2600-on-ohm.sh, deploy-c1-to-ohm.sh,
  backup-ohm-kernel.sh - reproducible build + deploy + backup.

- fw-analysis/: per-blob strings.txt + fnnames.txt extracted from the
  4 firmware blobs pulled from ohm 2026-04-21. Source binaries NOT
  committed (Bestechnic-proprietary).

- notes/: observed-bugs.md (4 known bug surfaces with file:line +
  patch-series cross-reference), source-map.md (every public driver
  source variant + their canonical role).

Companion work tree: marfrit/bes2600-dkms (Mobian DKMS fork) at
git.reauktion.de.

Signed-off-by: Markus Fritsche <fritsche.markus@gmail.com>
2026-04-22 10:13:23 +02:00