Phase 4 plan: decrypt-storm fast-recover (Trigger B), with revised Phase 1 #4

Merged
marfrit merged 1 commits from claude-noether-2 into main 2026-05-06 17:30:49 +00:00

1 Commits

Author SHA1 Message Date
test0r f6a25d811f notes: phase 4 plan artifact for BES2600 wifi-stability campaign
Drafts Patch A (decrypt-storm fast-recover, Trigger B) at txrx.c:1696
with sliding-window threshold + ieee80211_connection_loss reassoc.
Patch B (beacon-loss / Trigger A) parked behind one more diagnostic
rep with 10s snap-loop cadence on the beacon-loss counter.

Folds reviewer feedback from PR #3 + the new Trigger-A finding
(post-resume P1 = api_connection_loss-driven, two reps captured today
at 17:23 and 18:03) into a revised Phase 1 metric counting three
event classes.

Pending Phase 5 second-model review of the plan before Phase 6
implementation.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-06 19:10:12 +02:00