Phase 0: browser X11-overlay inventory + mpv reference cell + tooling installs
Source-level verdict: no browser in the matrix has a code path to hand NV12 to the X server for plane scanout. Chromium ozone-x11 wires StubOverlayManager (ozone_platform_x11.cc:262); Brave 147 + chromium-fourier 149 inherit unchanged. Firefox WindowSurfaceX11 is RGB-only. The campaign's load-bearing hypothesis is structurally weakened — what the X11 cells will measure for browsers is KWin's per-frame RGB-recomposite cost, not the original "force-GL-composite of NV12" framing. mpv --vo=xv becomes the matrix's only direct test of the operator-supplied mechanism. Matrix updated: 12 cells -> 16 cells (+8 mpv VO sub-points). revert.log entries 1-5 capture all package + per-user state mutations from this turn (measurement tools, openbox, XFCE + xfwm4-no-comp pre-seed, firefox + AUR xtrace, XFCE rotation + touchscreen mapping); single SSH-driveable revert chain returns ohm to its pre-campaign 1169-package state. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|
|
5d34a957ee |
Phase 0: X11 paths + measurement-instrument inventory captured
Live Plasma X11 session on ohm probed over SSH; substrate is healthy (xorg-server 21.1.22 + Mesa 26.0.5 / Panfrost, modesetting in-server, all 7 needed X protocol extensions live). Evidence in phase0_evidence/x11_inventory_2026-05-03/ — five raw captures + inventory.md summary. Worklist deliverables 2 + 4 flipped to done with operator-action checklist for the remaining gating items (no non-compositing WM installed today; six candidates one pacman -S away, openbox recommended). Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|
|
e8bae670d3 |
Campaign-contained data discipline + repo notice
Operator directive 2026-05-03: this campaign acquires all its own measurement data from scratch. Predecessor numbers are documented for context but never imported as binding cells, comparison targets, or success thresholds. The lesson the predecessor (kwin_overlay_subsurface) closed-without-patch on is exactly that: phase 1 cells anchored to a single historical ohm_gl_fix Phase 0 measurement, three weeks of phase planning on a baseline that didn't reproduce in-session. The strongest version of feedback_replicate_baseline_first.md: "don't import predecessor data, acquire it fresh." The discipline is now documented as a governing rule in three places: - README.md § "Campaign-contained data discipline" - phase0_findings.md § "Campaign-contained data discipline (governing rule)" - worklist.md § "Governing rule (every phase)" Concrete consequences: - A1 baseline (Phase 0 task) is now mandatory at N=3 reps. Single-rep wasn't enough to surface session variance in the predecessor; doing 3 up front makes the baseline robust to the same kind of session-state drift that ate the predecessor's premise. - Phase 1 thresholds are drawn against the A1 baseline measured in this campaign, not against any predecessor number. - metrics.csv (when it lands) only carries data from this campaign's reps. No predecessor rows imported. README.md additionally: - Adds the predecessor chain (ohm_gl_fix -> kwin_overlay_subsurface -> this campaign) with explicit "what stays valid for source- reading" vs "numbers that don't" separation. - Calls out durable substrate available from predecessors: KWin scanout-promotion archaeology, measurement-protocol template, WAYLAND_DEBUG parser. All structural; none measurement-numerical. - Carry-over predecessor system state on ohm (governor pin, baloo disabled, fourier packages) is explicitly distinguished from measurement data. System state inherits; data does not. - Repository line points to the gitea remote ssh://gitea@git.reauktion.de:2222/marfrit/x11-session-research.git phase0_findings.md additionally: - Reframes the predecessor-close-out summary section header to "(context, not data)" and rephrases past-tense numbers so none are stated as "the baseline." - Adds the discipline lesson narrative in-line before the predecessor close-out: a 30-minute N=3 same-session baseline on day 1 of the predecessor would have made the campaign different — and that's the move this campaign starts with. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|
|
ac301b4e48 |
Phase 0: motivation locked + mechanism captured
Operator-supplied research question 2026-05-03: "Does cutting out the KWin compositor enable faster video display of Brave, chromium-fourier, and Firefox — for full SW decoding, and for libva decoding (where possible) — on PineTab2 RK3568?" Operator-supplied mechanism 2026-05-03 (two messages): 1. "hantro emits NV12 which the GPU can't put on a compositeable plane. So that is the real bottleneck of Wayland." Connects directly to predecessor's Phase 1 finding (kwin_overlay_subsurface/phase2_source_findings.md:170-229): rockchip-drm overlay Plane 45 advertises no NV12 modifier; Primary Plane 39 supports NV12 LINEAR but is owned by KWin for its compositor framebuffer. Predecessor named the constraint but not the consequence — the consequence is that NV12 → RGB GL-composite is forced on Wayland-with-KWin regardless of which protocol path the browser uses. 2. "A X11 pipeline would route around that by giving a portion of screen real estate directly to the video pipeline." The X11 hardware-overlay path: with X11 + non-compositing WM, the X server can allocate Plane 39 (NV12 LINEAR) to the video region and Plane 45 (RGB AFBC) to the rest of the desktop. Hardware-blended at scanout. NO GL-composite anywhere — the cost the operator named as "the real bottleneck" is structurally avoided. This is the X11 hardware-overlay mechanism that historically made X11 desktops good at video playback (Xv → modern DRI3 + XPresent + Composite-redirection-disabled). Wayland-with-monolithic-compositor designs cannot use this freedom: the compositor must own the Primary plane, so the plane-allocation freedom required to put NV12 video on Plane 39 alongside RGB chrome on Plane 45 isn't available. phase0_findings.md updated with: - Locked research question + 12-cell experimental matrix (3 browsers × 2 decode paths × 2 sessions; some N/A). - Three separable cost components the matrix tests for (mandatory NV12→RGB GL conversion if hardware-overlay doesn't engage, fallback GL-composite, per-frame compositor overhead independent of NV12). - Open questions about whether browsers actually request hardware-overlay presentation under X11, or whether they always internally composite to RGB. - Recommendation to add mpv as a reference X11-overlay client: distinguishes "X11 path works on this hardware" from "browsers actually use the X11 path." worklist.md updated: - Phase 0 motivation + matrix items ticked. - Pre-Phase-1 inventory broken out: state snapshot, X11 path inventory, browser-overlay-path inventory, mpv reference, X11 measurement-tool inventory, A1 Wayland baseline anchor. - Phase 1 sketch: binding cells per matrix cell, clear-pass / clear-fail thresholds, measurement protocol mirroring the predecessor's phase3_protocol.md structure. README banner updated to reflect locked motivation + mechanism summary + matrix shape. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|
|
eff6fb5b29 |
Phase 0: campaign skeleton, research question pending
Spun off 2026-05-03 from the closed-without-patch kwin_overlay_subsurface campaign (its phase8_handover.md is the predecessor). The candidate research question is whether running an X11 session on PineTab2 reproduces, eliminates, or transforms the drop-inversion phenomenon that motivated the predecessor — but the framing is provisional and awaits operator confirmation before Phase 1 lock. phase0_findings.md is the substrate doc: - Predecessor close-out summary (three reasons no patch landed; replicate-baseline-first lesson). - What stays valid from the predecessor (Phase 1 scanout archaeology, Phase 2-prime KWin Wayland source-read which does NOT transfer to X11, Δ_present-46ms reproducible side-finding which is directly testable under X11, measurement infrastructure with WAYLAND_DEBUG-specific parts that don't transfer). - Current ohm state (carry-over predecessor tooling, governor pin, baloo disabled, kwin-fourier still installed). - Provisional research question with three plausible outcomes (α/β/γ) and four alternate framings the operator may have in mind that this question doesn't cover. - Working-assumption out-of-scope list (no patches, no MRs, no Δ_present chase yet). - Four pre-question Phase 0 deliverables that are unblocked regardless of framing: ohm state snapshot, X11-path inventory, X11 measurement-tool inventory, A1 Wayland-baseline rep on this campaign's session for future comparison anchor. worklist.md tracks Phase 0 only. Phase 1 lock awaits the research question. Discipline carry-overs from kwin_overlay_subsurface listed (replicate baseline first; phase discipline; non-upstreaming default; memory persistence at close). README.md status banner: Phase 0 in progress, research question pending operator confirmation. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |